Value £2.4M
Gross Internal Area 1800 m²
Project Start Date November 2023
Completion Date October 2025
Bar, Dining, Private Room, Kitchen, Back-of-House, Garden, Terraces
Steel & timber roof frame, Crittall glazing, bespoke joinery, premium finishes
The venue will reopen as a Mexican fusion restaurant with an expanded food-led focus. The Prickly Pear has been reimagined as a high-end dining and events venue with multiple spatial moods: a cozy bar, refined dining, and an elegant private dining room.
The formerly unused skittle alley is now a high-functioning kitchen, unlocking new operational flexibility.The private dining room above, with vaulting and natural light, provides a signature architectural moment that adds value and experiential draw.
The renovation led to a significant increase in seating capacity, supported by a revised premises license allowing extended hours for music and alcohol sales (10:00 AM daily, live music until midnight), reflecting the venue's new operational model.The project maintains respect for the building’s heritage, while equipping it for 21st- century hospitality use, successfully navigating multiple Listed Building Consent applications.
These lessons were critical for the successful execution of the complex refurbishment of a Grade II listed building under intense structural and operational constraints:
Insight: Our core challenge as main contractor was executing the "clever structural redesigns" required to fit modern services and high-end aesthetics within low ceiling heights and confined areas.
For us success depended on precise load-bearing reinforcement and meticulous coordination of floor levels and duct runs before finishes went in. Risk mitigation was key in addressing the unstable gable end and required the underpinning.
Working within a Grade II listed structure means every design intervention had to be carefully managed to satisfy conservation standards while ensuring the design brief was met.
As the contractors we had to utilise our portfolio of specialist heritage repair methods and ensure all new elements, like the second floor extension doors and roof vaulting were built to a sympathetic yet highly engineered standard.
Service Integration (MEP & Acoustic): Upgrading the 3 Phase power supply. An further in site we gained is that In hospitality projects, the quality of the service infrastructure (MEP) determines guest comfort and operational compliance (acoustics/extraction)
To open up the ground floor space from its fragmented arrangement, we had to install over 10 tonnes of steel top pitch up the various walls to allow for the open plan effect. This led to the biggest structural challenges and the coordination of a sequence of 50 underpins to stabilise the historic perimeter walls and in turn allowed us to lower the floor levels.
Structural repair in old buildings always introduces unknowns and further challenges As the main contractor we had to manage specialist subcontractor scheduling to handle the inevitable delays caused by listed building consent adjustments and unforeseen site conditions, ensuring materials like the bespoke sliding doors and power switch on were procured to avoid critical path delays.